Hampton Court Rd – the story continues

Once upon a time there were two narrowish advisory cycle lanes down this rather nasty ( high speeds and traffic volume) between Kingston Bridge and Hampton Court Bridge. LB Richmond decided that these were ineffective and decided with little consultation to put a 2-way cycle track on the north side from Church Grove but  ending about half way down the road. If you were crossing Kingston Bridge you would have to cross somehow to the north side and re-cross with even less assistance half way to Hampton Court. Unsurprisingly cyclists tend not to do that but were continuing on the north footway to the annoyance of local residents.

We have just had a communication suggesting the possibility of further action :

We have given initial though to widening the footway on the northern side of the road, as a continuation to the existing off road facility to the Chestnut Avenue junction. This will reduce the road width to 7.0m but would provide a general 4.0m shared footway (some variations in places).  In order to implement this, it would be necessary to remove the two existing on road cycle lanes.  We will also be looking at crossing cyclists at the Chestnut Avenue zebra, with continued shared use to the HCR roundabout.  The road width reduction would be beneficial in reducing vehicle speeds as there is an issue with vehicles travelling well above the 30mph speed limit.

 As part of this project we will also be giving consideration to how we link the roundabout to the existing off road facility further along HCR, past the green and the Esso garage.   I would like to stress that this is only being considered at this stage and is not yet out to public consultation. Your initial views would be welcome.

My initial view was that this was some improvement on the current situation whilst still wistfully thinking that if Richmond and Surrey could get their act together we could have a continuous track on the south side from Kingston to Esher. Comments from users welcome.

Paul